Skip to content
Al-Zouk Al-Massi workshop markAl-Zouk Al-Massi

CR 2055139268VAT 311901806100003Dammam · Jubail · Kingdom-wide

· Eastern Province

Industrial waste pump overhaul: wet end and motor

Industrial waste pumps fail at the wet end and in the motor, often in the same event: effluent through a seal, then an earthed winding. Overhaul at Al-Zouk Al-Massi in Jubail strips hydraulics, replaces seals and wear parts, and rewinds the motor when the stator is dead. Dammam plants should not split that into two contracts.

Industrial centrifugal pumps coupled to electric motors in a plant room
Centrifugal pumps · Wikimedia / Saud

One machine, two ends

Impeller clearance, wear rings, and mechanical seals are the hydraulic job. The motor is the electrical job. A pump that trips after a seal leak needs both recorded on the same card.

Related pump work

Flyjet, Hydromatic, and submersible sets follow the same logic. See the pump service pages for brand-specific faults. Workshop: Oraifi Industrial District, Jubail.

Related trade07 Industrial waste pump overhauling

Industrial electric motor mounted on plant machinery

Contact

Send a query with the nameplate and the fault.

The form is used only to reply to this query. It is not a mailing list.

Call 056 489 5748Contact us

056 489 5748