Skip to content
Al-Zouk Al-Massi workshop markAl-Zouk Al-Massi

CR 2055139268VAT 311901806100003Dammam · Jubail · Kingdom-wide

13 · Services

Transformer rewinding

Transformer rewinding is done in the Jubail workshop for industrial power and control transformers. Failed coils are stripped, wound to original turns and insulation, assembled, and tested. Units are received from Dammam and other Saudi plants.

A transformer rewind is turns, insulation class, and a dry-out — not a motor job with a different name.

Disassembled three-phase motor with copper stator windings and squirrel-cage rotor
Copper stator · rotor · Wikimedia / Zureks

Typical faults

  • Burned HV or LV windings
  • Earth or inter-turn failure
  • Oil or dry-type insulation breakdown
  • Open circuit after overload or moisture

What comes in

  • Industrial power transformers within shop capacity
  • Control and machine transformers
  • Related coils and tap gear

Questions

Asked before the first visit

Do I need to bring the machine to Jubail?
Rewind and shop balancing are done in Jubail. Site diagnosis and some generator or mechanical work can be done in Dammam or elsewhere.
What information should I send with a request?
Nameplate photo, kW or kVA, voltage, speed, fault symptoms, and the city of the machine. That shortens the first call.
Industrial electric motor mounted on plant machinery

Contact

Send a query with the nameplate and the fault.

The form is used only to reply to this query. It is not a mailing list.

Call 056 489 5748Contact us

056 489 5748