B-22 · Eastern Province
Process fan impeller after rebuild
Two-plane · residual logged · shop balance

Site
Eastern Province
Equipment
Process fan impeller after rebuild
Fault
High vibration at operating speed
- Action
- Computerized two-plane balance in the Jubail shop; residual unbalance recorded.
- Result
- Vibration reduced to a grade suitable for return to the process line.
